MYENERGY SOLUTIONS (PVT) LTD, AUTHORISED EAST® GROUP ESS DISTRIBUTOR | SRI LANKA & MALDIVES | ISLAND-WIDE DELIVERY & INSTALLATION
Authorised EAST Group ESS Distributor | Sri Lanka & Maldives

What is your electricity bill really costing you?

Rs/month
HomesHotels and factories
Move the slider or type your bill, then continue to see your system.
Authorised EAST Group ESS Distributor 10-year EAST manufacturer warranty Island wide delivery and installation Free site assessment
Figures are illustrative. Final system size, savings, warranty terms and pricing are confirmed after your free site assessment and official quotation.

Authorised EAST Group ESS Distributor for Sri Lanka and the Maldives, with island wide delivery and installation.

Authorised EAST Group ESS Distributor 10-year EAST manufacturer warranty Free site survey Island wide delivery
Beat the rising top tariff block Free assessment, no obligation

Three steps to your own power

01

Size it right

Use the instrument above for a real system and real savings against the May 2026 CEB tariff, not a guess, not a brochure number. You see the hardware and the price before anyone calls.

02

Free site assessment

Our energy consultants confirm your roof, switchboard and supply, then hand you a fixed proposal. No surprises on installation day, no moving numbers.

03

Install & switch on

Certified installation in a single day. Your system runs on self-consumption, so your savings never wait on utility approvals. The EAST monitoring app is set up on your phone before we leave. From the first sunny morning, you're generating your own electricity, typically 2 to 4 weeks from survey to switch-on.

A bill is a cost.
A system is an asset.

No net-metering windfall to chase here. The value is simpler and far more durable than that.
Staying on the grid alone

Money you'll never see again

  • Every rupee you pay is gone. It buys nothing you keep.
  • Tariffs keep being revised; the >180-unit block is now Rs 100/unit.
  • When the grid drops, you're in the dark with everyone else.
  • In ten years you've paid millions and own nothing.
Owning an EAST system

An asset that pays you back

  • Sunlight you've already paid for runs your home by day.
  • A LiFePO4 battery shifts that power into the costly evening hours.
  • Grid cut? You switch over in under 10ms. Most appliances never notice.
  • After payback, enjoy 6,000+ cycles of near-free electricity. Payback period depends on your usage and tariff. See the calculator for your numbers.
Island wide installation: Colombo, Kandy, Galle, Jaffna and beyond 10-year EAST manufacturer warranty
Backup, not a generator

When the grid goes dark,
your house doesn't.

Under 10 milliseconds: the fridge keeps humming, the Wi-Fi stays up, and the room never even flickers. No fuel, no fumes, no pull-cord.

Engineered to outlast the problem

EAST (Dongguan, est. 1989, 2.3bn CNY registered capital, Shenzhen Exchange listed) is a Global Top 500 new energy enterprise, the same hybrid platform sold under premium badges worldwide. Here's what's inside.
EAST Authorised EAST Group ESS Distributor en.eastups.com
EAST modular LiFePO4 storage, stack as you grow
Modular LiFePO4 storage, single phase: LV (48V) stacks from 5→32 kWh, three phase: HV (750V) integrated cabinet from 21→63 kWh across 3 clusters
Power vs capacity

Sized to your real loads

The inverter (kW) is the heart; the battery (kWh) is the fuel tank. A 6kW inverter comfortably runs an AC, the fridge, pump, TV and most appliances at once, with headroom for the kettle. We size both. We never sell you a box you don't need.

Backup

Instant switchover

A <10ms transfer means desktops don't reboot and POS terminals don't crash. EAST built their reputation on UPS systems. This switchover is their core competency. The inverter absorbs a 120% surge so pumps and compressors restart cleanly. Backed by the 10-year EAST manufacturer warranty. Covered components and terms are confirmed in your official quotation.

Battery chemistry

LiFePO4: the safe one

Lithium iron phosphate is the industry standard for thermal stability, with a per-pack fire-protection module. If one module ever faults, the BMS isolates it and the rest keeps running while you're alerted on the app.

Climate rating

Built for Sri Lanka

IP66 means fully dust-tight and sealed against heavy rain and coastal salt air. Natural cooling keeps it under 25dB, silent enough beside a bedroom wall. Rated to 60°C.

System architecture

Two architectures, one platform

Single phase homes use a low voltage (LV) 48V battery stack, from 5 kWh up to 32 kWh, installed indoors. Three phase homes use a high voltage (HV) 750V integrated cabinet from 21 kWh, up to 63 kWh across three clusters. Both use LiFePO4 cells and the same EAST BMS.

EV-ready

Fuel your car from the roof

Charge overnight from stored solar or cheap off-peak power with an integrated EAST Atlas charger. Single phase homes: 7kW with 40A supply upgrade. Three phase: 11-22kW natively. Your roof can quietly run your EV.

LV, 48V

Low voltage battery

For single phase homes (30A supply). Safe, compact, mounts on a wall inside your utility room or garage. Stacks from 5 kWh up to 32 kWh. Pairs with either single phase inverter, the EAHI-6000-SL 6kW or the EAHI10-12KSL 10 to 12kW.

Standard house or apartment on single phase
HV, 750V

High voltage battery

For three phase homes and businesses (60A+ supply). Higher voltage means less current for the same power, with thinner cables, lower losses, more efficient at scale. Stacks 21 kWh per cluster, up to 63 kWh across three clusters. Integrated into the EAHI10KTH-S all in one cabinet. EAST does not make a three phase LV inverter.

Larger home, three phase apartment, or commercial on three phase
FAQ

Straight answers.

Do I need a roof?
For solar, yes, but not for everything. If you rent or have no usable roof, a battery-only system still shaves the expensive evening peak and keeps essentials running through outages. Set panels to zero in the builder.
Is this net-metering? Will I sell power back?
Our savings do not rely on exporting to the grid. The value is self-consumption (using your own solar), peak-shaving (storing cheap power for costly hours), and backup. That is why a battery matters: without one you can only use solar while the sun is up.
How accurate is the savings figure?
It is calculated on the real CEB tariff effective 11 May 2026, with realistic self-consumption assumptions (no net-metering windfall). Your final proposal refines it with roof orientation, shading and your actual load profile after a free site visit.
What is a “demand charge”, and why does it matter for my business?
Above 42 kVA, the CEB bills you per kVA of peak demand every month, often the single biggest line on the bill. A battery shaves that peak, cutting the charge directly. For hotels and factories this is frequently the largest saving, stacked on top of solar and time-of-use arbitrage.
How long does it last?
The LiFePO4 cells are rated for 6,000+ cycles, well over a decade of daily use, and degrade gently. Modules are individually replaceable, so the system is maintained, not thrown away.
How long does backup last during a power cut?
It depends on battery size and what you are running. On essential loads (lights, fridge, fans, Wi-Fi, phone charging), a 10 kWh battery lasts 12 to 20 hours. Running an AC drops that to 4 to 6 hours. The calculator shows your backup range, so you size the battery to what matters to you.
How long does installation take?
Most residential installs complete in a single day. The full timeline from your free site assessment to switch-on is typically 2 to 4 weeks: survey, fixed proposal, equipment order, and installation day. Because the system runs on self-consumption, your switch-on never waits on utility approvals.
What is the difference between LV and HV batteries?
LV (low voltage, 48V) and HV (high voltage, 750V) refer to the battery architecture, not a quality difference. LV batteries are used with single phase supplies (standard 30A homes). HV batteries are used with three phase supplies (larger homes, apartments with three phase, businesses). EAST currently makes a three phase inverter only in the HV configuration, there is no three phase LV option. Your bill or meter will confirm which you have.
1989EAST
manufacturing since
AuthorisedEAST Group ESS
Distributor
6,000+LiFePO4
charge cycles
<10msgrid-cut
switchover
IP66dust & rain
sealed
140+countries
served by EAST
10-yearEAST manufacturer
warranty

Your roof is already getting paid.
The question is who collects.

An honest assessment and a fixed proposal. No pressure, no jargon.